[Case Study] Achieved floor repair and anti-slip measures simultaneously in just one day!
Achieve floor repairs and anti-slip measures simultaneously in just one day!
Water was being flowed on the floor of the food factory, and the boundary areas with the grating and the side mortar of the drainage pit were deteriorating. It was unsanitary, and further deterioration seemed likely due to the cracks, so they wanted to carry out repairs, but they were troubled by the difficulty of stopping factory operations for an extended period. Issues: 1. Since water is flowing on the floor, measures should be taken to prevent workers and carts from slipping and falling. 2. Only one day is available to secure the construction period. 3. As it is a food factory, substances that produce strong odors cannot be used.
- Company:蒲田工業
- Price:Other
![[Case Study] Achieved floor repair and anti-slip measures simultaneously in just one day!](https://image.mono.ipros.com/public/product/image/6fc/2000196382/IPROS2201889886906866089.jpg?w=280&h=280) 
 ![[Case Study] Ultra-fast drying, high strength, inorganic materials for floor repairs in food factories.](https://image.mono.ipros.com/public/product/image/78f/2000196475/IPROS9104190851746550215.jpg?w=280&h=280) 
  
  
  
  
  
  
 ![[Construction Case] Kawaguchi City T Building Materials Step Leveling Work](https://image.mono.ipros.com/public/product/image/1d8/2000583182/IPROS83937828967872732369.png?w=280&h=280)